Warehouse
Warehouse shell
A high bay, a dock, and a small office with a service sink. The bay is dry. Plumbing stays in the office.
Walk the teaching model
Orbit the rough-in, open the rooms, or walk through them. The ducts, pipes, and cable are a picture of this plan, not a working drawing.
- Framing
- Hot water
- Cold water
- Drain
- Power
- Air duct
Hover a run or device, click to learn what it is
A warehouse shell: high bay, dock, office, service sink. Do not run plumbing across the bay. Leave clear height and slab load blank.
Use this on its own, or on a real site
This copies the Warehouse shell teaching spec. Illustrative numbers stay illustrative. A standalone example has no site. Associating it with Orbit names the tiles and, when the point has an address, only that place's code card.
Standalone example. Scene: teaching-plan. No site tiles, and no local code.
constructpm:type/warehouse-shell
- Clear height. job-measured · job-measured
- Slab load. job-measured · job-measured
- Wet room. service sink only · illustrative
